- Bridge & Tunnel
Liantang/Heung Yuen Wai Boundary Control Point
BYME was commissioned to provide E&M Works for 2 sections of dual-tube two-lane Tunnels – Cheung Shan Tunnel & Lung Shan Tunnel, 56 nos. of Cross Passage areas & Building Services Systems for 6 auxiliary Buildings.
Client
Civil Engineering and Development Department
Project period
Dec 2013 – Jun 2019
Scope of works
- Electrical System
- Environment Control System
- Extra Low Voltage (ELV)
- Fire Services
- Mechanical Ventilation & Air-Conditioning (MVAC)
- Plumbing & Drainage
- Tunnel Ventilation System