Liantang/Heung Yuen Wai Boundary Control Point

BYME was commissioned to provide E&M Works for 2 sections of dual-tube two-lane Tunnels – Cheung Shan Tunnel & Lung Shan Tunnel, 56 nos. of Cross Passage areas & Building Services Systems for 6 auxiliary Buildings.

Client

Civil Engineering and Development Department

Project period

Dec 2013 – Jun 2019

Scope of works

  • Electrical System
  • Environment Control System
  • Extra Low Voltage (ELV)
  • Fire Services
  • Mechanical Ventilation & Air-Conditioning (MVAC)
  • Plumbing & Drainage
  • Tunnel Ventilation System