Communications and Technology Centre at Sha Tin Racecourse

To cope with the operation of the live site, including the betting centre and the live broadcast facility, works were required to be carried out during non-office hours. To maximise work efficiency, BYME worked out an optimal work schedule in terms of manpower and logistics arrangements. 

Due to the open-ceiling design, all E&M installations are required to attain the highest level of tidiness and acoustic standards.

Client

The Hong Kong Jockey Club

Project period

Nov 2015 – May 2016

Scope of works

  • Full E&M package services for one floor
  • Commissioning of chilled water system