Kowloon Shangri-La Hotel

 The replacement works within the 21-storey hotel include dismantle of existing aluminium busways, divert existing sub-main circuits to new main risers busways and reinstate the existing floor/wall opening.

The works carry out under normal operation of the Hotel. In order not to cause any nuisances to operation of the hotel, overnight works at front of house areas and kitchen is required.

Client

Kowloon Shangri-La Hotel

Project period

Feb – Oct 2019

Scope of works

  • Replacement of Electrical Busway 
  • Main and Sub-main LV Distribution Cable