- Bridge & Tunnel
Trunk Road T2 and Cha Kwo Ling Tunnel
Trunk Road T2 and Cha Kwo Ling Tunnel project (T2 project) is a 3.4km long dual two-lane trunk road together with two ventilation buildings. Once completed, it will be part of the strategic road network, providing an east-west express link between West Kowloon and Tseung Kwan O while relieving the heavily congested road.
BYME has been commissioned to provide design, manufacture, supply, installation, testing and commissioning of Mechanical, Electrical & Plumbing (MEP) Systems.
In addition to the first contract, we were tasked to provide installation, testing and commissioning of the Traffic Control and Surveillance System.
The T2 project showcases a meticulous blend of technical expertise and innovative methodologies. As the E&M contractor of the project, BYME Engineering (Hong Kong) Ltd. adopted Multi-trade Integrated Mechanical, Electrical and Plumbing (MiMEP) approach in the construction, aiming to enhance safety, streamline operations and increase productivity.
Client
Civil Engineering & Development Department
Project period
Nov 2019 – ongoing
Scope of works
- Electrical
- Environment Control System
- Extra Low Voltage
- E&M Security System
- Fire Services
- Mechanical Ventilation & Air-Conditioning
- Plumbing & Drainage
- Tunnel Ventilation System
- Traffic Control and Surveillance System